News

12.04.2018

STATION BLOEMENDAAL

ProRail makes stations accessible to travelers everywhere in the country. Thus Bloemendaal station gets two elevators. For example for people who have difficulty walking. But also useful for travelers with heavy suitcases.

To make the elevators, two construction pits are required. B & P Bodeminjectie has taken care of the soil sealing of these pits by using two drilling rigs which have been designed and built in-house.

Meanwhile, the two pits have been brought to depth by sucking off the sand, both where dry.

Linked specialisms

28.03.2019

Wanted

For our close team, we are looking for enthusiastic colleagues who find it a challenge to solve the moisture problems in construction pits and structures on a daily basis.

Read more

Gezocht: (leerling) injecteerder