News

11.03.2019

DOW Benelux

Recently realized: soil stabilization d.m.v. waterglass-harder with one of our self-developed drilling rigs. The project concerns the construction of a bypass of the seawater pipeline at the DOW site in Terneuzen. The existing pipeline is cut and an above-ground bypass is built. To be able to realize this, a construction pit has been made, the sides of the pit parallel to the pipelines are enclosed within sheet pile. The sides of the pit perpendicular to the pipelines are closed by a Berliner wall. The soil on these sides is injected with water glass hardener to create a flood defense.

Linked specialisms

28.03.2019

Wanted

For our close team, we are looking for enthusiastic colleagues who find it a challenge to solve the moisture problems in construction pits and structures on a daily basis.

Read more

Gezocht: (leerling) injecteerder